Indexed by:
Abstract:
In this paper, we consider a three-machine permutation flow shop scheduling problem under simple linear deterioration. By a simple linear deterioration function, we mean that the processing time of a job is a simple linear function of its execution start time. The objective is to find a sequence that minimizes makespan. This problem is well known NP-hard. Optimal schedules are obtained for some special cases. For the general case, several dominance properties and two lower bounds are derived to speed up the elimination process of a branch-and-bound algorithm. Moreover, a heuristic algorithm is proposed to overcome the inefficiency of the branch-and-bound algorithm. Computational experiments on randomly generated problems is conducted to evaluate the branch-and-bound algorithm and heuristic algorithm. The analysis shows that the proposed heuristic algorithm performs effectively and efficiently. (C) 2010 Elsevier B.V. All rights reserved.
Keyword:
Reprint Author's Address:
Email:
Source :
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
ISSN: 0925-5273
Year: 2010
Issue: 1
Volume: 125
Page: 185-189
1 . 9 8 8
JCR@2010
7 . 8 8 5
JCR@2020
ESI Discipline: ENGINEERING;
JCR Journal Grade:2
CAS Journal Grade:1
Cited Count:
WoS CC Cited Count: 20
SCOPUS Cited Count: 20
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 11