Indexed by:
Abstract:
This letter presents a double-side measuring method for online partial-discharge ( PD) detection and location in covered conductor ( CC) lines. To synchronize both PD sampling units mounted on two separate sides, a novel time alignment technique is proposed and implemented using the combination of a pulse injector and a pulse detector. A laboratory experiment on a 10-kV CC line was conducted to verify the feasibility of this technique.
Keyword:
Reprint Author's Address:
Email:
Source :
IEEE TRANSACTIONS ON POWER DELIVERY
ISSN: 0885-8977
Year: 2016
Issue: 6
Volume: 31
Page: 2559-2561
3 . 2 1 8
JCR@2016
4 . 1 3 1
JCR@2020
ESI Discipline: ENGINEERING;
ESI HC Threshold:128
JCR Journal Grade:2
CAS Journal Grade:3
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count: 4
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 0
Affiliated Colleges: